Featured Projects

We build a wide variety of structures with one thing in common; they last. Actually, make that two things. They last, and they look good doing it. These are just a few of our favorite projects. Like what you see? Contact us today.

Markets

Services

George T. Harrell, M.D., Medical Education Building

George T. Harrell, M.D., Medical Education Building | University of Florida

Location: Gainesville, FL
Project Size: 95,380 SF
Construction Cost: $26,294,965

The George T. Harrell, M.D. Medical Education Building provides education and support facilities that address requirements for increased small-group and active learning, the use of simulation and standardized patients for professional development and assessment, and state of the art information technology. The building houses laboratories and primary learning spaces for medical students and physician assistant students as well as education related offices and student support services. This project provides a specialized interdisciplinary learning environment that will meet the needs of medical student and physician assistant student educational programs. This project is LEED Gold Certified.

McKethan Stadium & Lemerand Center Expansion

McKethan Stadium & Lemerand Center Expansion | University of Florida / University Athletic Association

Location: Gainesville, FL
Project Size: 49,712 SF
Construction Cost: $10,046,633

This multi-building project included the expansion of McKethan Baseball Stadium, a new training facility, construction of a building for indoor hitting, renovation of the locker rooms in the Lemerand Center and a complete renovation of the plaza area surrounding the baseball stadium. In addition, a football equipment building was built on the adjacent football practice fields. The plaza renovations were completed for the start of the 2005 baseball season, while the construction of the new bullpen continued throughout the season. While the project is relatively small in building square footage – 24,000 square feet – CPPI faced many challenges including site access, site utilities and lack of laydown and staging areas. All work had to be done while school was in session, and activity had to work around the schedules of baseball and football, as well as track and soccer, which use adjacent fields, and the volleyball, basketball, track, and other teams that use the Lemerand Center locker rooms. This project is LEED Certified.

Nextran Corporation

Nextran Corporation

Nextran Atlanta Truck Center
Location: Atlanta, GA
Project Size: 57,864 SF
Construction Cost: $8,750,000

Nextran’s Atlanta Truck Center is a full sales and service operations center. This facility also includes a separate area that will solely service vehicles powered by natural gas.

Logistics and Technology Building | RTI Surgical, Inc.

Logistics and Technology Building | RTI Surgical, Inc.

Location: Alachua, FL
Project Size: 41,933 SF
Construction Cost: $12,302,194

RTI Surgical’s Logistics and Technology center is located in Alachua, Florida. This facility accommodates research and development labs, clean rooms, warehouse, shipping and finished implants, as well as production of map3 cellular allogeneic bone grafts.

RTS Bus Fleet Maintenance & Operations Facility | City of Gainesville

RTS Bus Fleet Maintenance & Operations Facility | City of Gainesville

Location: Gainesville, FL
Project Size: 127,000 SF
Construction Cost: $32,617,000

This project consisted of a new transit complex for the City of Gainesville’s Regional Transit System. The complex includes a maintenance facility with capacity for 200 buses and an operations and administration building that allowed the workforce to expand by 450 employees. This project was fully paid for by government funding.

Emergency Department & Tower Expansion | Health Central Hospital / Orlando Health

Emergency Department & Tower Expansion | Health Central Hospital / Orlando Health

Location: Orlando, FL
Project Size: 78,451 SF
Construction Cost: $38,000,000

This project consisted of the construction of a new space that connects the existing Emergency Department and renovations of existing space at Health Central Hospital. The project included a new 4-story patient tower above the new ED space. The new spaces required infrastructure upgrades to the existing Central Energy Plant. Upgrades included new paralleling gear, chillers, cooling towers and pumps.

Cypress Hall Single Student Housing | University of Florida

Cypress Hall Single Student Housing | University of Florida

Location: Gainesville, FL
Project Size: 68,000 SF
Construction Cost: $15,697,399

This 68,000 square foot single student housing facility offers a mix of Single Occupancy Suites, Double Occupancy Suites, Single and Double Occupancy ADA Enhanced Suites and several “Super Suite” style rooms where six residents would share one to three bathrooms and a living room space. The ADA Enhanced Suites include rooms for students with severe physical disabilities who require assistance in the performance of basic activities of daily living, making it only the second student residence hall in the country to feature rooms with such capabilities.

Dream Lake Elementary School | Orange County Public Schools

Dream Lake Elementary School | Orange County Public Schools

Location: Orlando, FL
Project Size: 80,000 SF
Construction Cost: $14,014,487

This project consisted of the demolition of the existing school campus, construction of new two story building, sitework, and renovation of two existing buildings. The buildings include classrooms, labs, offices, media center, cafeteria, kitchen, administration, CCTV, and clinic. Additional work included a new chilled water HVAC system, plumbing, fire sprinkler, electrical, low voltage systems, stormwater, sanitary, fire water, and water mains. The new/remodeled facilities accommodate 832 student stations.

Brooks College of Health Addition | University of North Florida

Brooks College of Health Addition | University of North Florida

Location: Jacksonville, FL
Project Size: 38,864 SF
Construction Cost: $10,146,781

The project consisted of the addition of a new multi-story wing to the existing Brooks College of Health. The building is used primarily by the School of Nursing and Student Health Services. The new addition included 38,864 square feet of classrooms, laboratories, support facilities, offices for the Director of Nursing, student lounges, meeting rooms, classrooms, simulation labs, and computer labs. The Student Health Services component of the facility included administrative offices, doctors offices, exam rooms, patient counseling, lab rooms, a pharmacy, and support spaces.

Isle of Hope K-8 Replacement School | Savannah-Chatham County Public School System

Isle of Hope K-8 Replacement School | Savannah-Chatham County Public School System

Location: Savannah, GA
Project Size: 124,680 SF
Construction Cost: $20,169,066

This project provided a state-of-the-art school that accommodates 800 students. The new construction consisted of 100,280 SF, with a portion of the existing facility being remodeled and reused. This project was funded by a penny tax and was an especially significant facility for the community. CPPI strived to encourage local participation, which resulted in 70% of this project being completed through the utilization of local subcontractors and businesses.

Judicial Center Phase I & II | Lake County Board of County Commissioners

Judicial Center Phase I & II | Lake County Board of County Commissioners

Location: Tavares, FL
Project Size: 190,800 SF
Construction Cost: $79,343,966

Phase I of the Lake County Judicial Center complex consisted of the 320 office building, a parking garage and a central energy plant. The 320 building houses the offices of the County Tax Collector and the County Property Appraiser. The parking garage accommodates 1,800 vehicles. The central energy plant produces the HVAC chilled water systems to service the existing courthouse facility and is sized for future capacity for the expansion of the courthouse. Phase II consisted of an expansion of the existing Lake County Courthouse building.

Dr. Kiran C. Patel Center for Global Solutions | University of South Florida

Dr. Kiran C. Patel Center for Global Solutions | University of South Florida

Location: Tampa, FL
Project Size: 74,788 SF
Construction Cost: $18,865,248

The Patel Center for Global Solutions project provides a unique opportunity for the University of South Florida to connect with the community on a local and global scale. The building was designed to anchor the major axis through campus and be clearly visible from Fowler Avenue, the south boundary of the USF campus and a major Tampa thoroughfare. The project seeks to promote research in the fields of water and energy conservation and uses the building as an icon to symbolize this goal.  A major design element was the desire to have formal and informal interaction spaces to encourage and promote interdisciplinary discussion. This project is LEED Gold Certified.

Oak Hammock Skilled Nursing Unit Addition | University of Florida Foundation

Oak Hammock Skilled Nursing Unit Addition | University of Florida Foundation

Location: Gainesville, FL

Project Size: 29,031 SF

Construction Cost: $5,679,000

This project consisted of a Skilled Nursing Unit addition to the existing Oak Hammock facility which includes renovations at the connection point. Additionally, the project includes renovations to patient rooms and bathrooms, as well as dining and activity room renovations.

Veterinary Education & Clinical Research Center | University of Florida

Veterinary Education & Clinical Research Center | University of Florida

Location: Gainesville, FL

Project Size: 104,717 SF

Construction Cost: $37,797,325

This project consisted of the construction of a 104,717 SF facility with educational and research spaces, a linear accelerator facility for small animals, veterinary interventional radiology and cardiology facilities, 22 examination rooms and 12 surgical suites. Non-clinical spaces included in the facility are a 140-seat seminar room and space for educational programs. This is a LEED Gold Certified building.

James W. “Bill” Heavener Football Complex | University of Florida / University Athletic Association

James W. “Bill” Heavener Football Complex | University of Florida / University Athletic Association

Location: Gainesville, FL

Project Size: 59,682 square feet

Construction Cost: $21,309,974

The Heavener Football Complex project consisted of construction of approximately 31,332 square feet of new space, and the renovation of 18,380 square feet of existing space at the southwest end of the University of Florida’s Ben Hill Griffin Stadium. The renovation and expansion included new offices, meeting rooms, weight room, interactive exhibition and reception area, a new Gator Room, and support space.

Public Defender’s Office | Alachua County Board of County Commissioners

Public Defender’s Office | Alachua County Board of County Commissioners

Location: Gainesville, FL

Project Size: 21,360 SF

Construction Cost: $4,502,653

The project consists of the construction of a 21,360 SF building on the Northwest side of the Alachua County judicial complex. The building serves as the Public Defender’s Office and also offers additional court support services. The construction of this new facility freed up the previously used facility for other uses by Alachua County. The new facility will be LEED Certified.

Lawnwood Regional Medical Center Rehab & Outpatient Physical Therapy Renovations & Expansion | HCA Hospital Corporation of America

Lawnwood Regional Medical Center Rehab & Outpatient Physical Therapy Renovations & Expansion | HCA Hospital Corporation of America

Location: Ft. Pierce, FL

Project Size: 21,500 SF

Construction Cost: $7,400,000

This project for Lawnwood Regional Medical Center consisted of renovations and expansion of the Inpatient Rehabilitation Nursing Unit and Outpatient Physical Therapy Services. This project took place on an occupied campus that was active during construction.

North Florida Regional Medical Center Patient Tower and Cardiology Renovations | HCA Hospital Corporation of America

North Florida Regional Medical Center Patient Tower and Cardiology Renovations | HCA Hospital Corporation of America

Location: Gainesville, FL

Project Size: 141,486 SF

Construction Cost: $30,289,265

The Patient Tower and Cardiology Renovations project consisted of a new 4-story, 92 bed patient tower, which features a 12 Position Level II NICU. The first floor of the tower includes parking and a small public elevator lobby, while the 2nd, 3rd and 4th floors contain patient beds. In addition to the new tower, the project incorporated a three-level horizontal expansion to the Women’s Center parking garage adding 98 spaces and 25,106 sf of renovations to the 1st Floor Cardiology Department, including the addition of a cath lab and the relocation of Non-Invasive Cardiology and Nuclear Medicine.

St. Augustine Government House Rehabilitation Phase I-III | University of Florida

St. Augustine Government House Rehabilitation Phase I-III | University of Florida

Location: St. Augustine, FL

Project Size: 29,300 SF

Construction Cost: $2,582,901

CPPI has rehabilitated portions of the St. Augustine Government House to accommodate a new museum space and associated lobby, circulation, restroom spaces, and history-related retail sales space.  The design included specifications for fixed casework, lighting, interior finishes, HVAC upgrades, electrical upgrades, plumbing, security, fire suppression, audio-visual equipment, food preparation space, loading / storage, and reception area in keeping with the historic character of the Government House structure.  This rehabilitation updates the current Government House museum to accommodate travelling and permanent exhibits with flexible spaces for lectures, and public gatherings.  The resulting work product will position the State of Florida to install a world-class interpretive museum in St. Augustine while accomplishing significant building restoration.  This first phase of work created a centerpiece for the anniversaries of the State of Florida and the city of St. Augustine spanning the years 2013 through 2017 and will draw many visitors to St. Augustine and St. Johns County, generating significant revenue and job creation. The second phase was completed in 2014 and the third phase will be completed in 2016. The building was added to the National Register of Historic Places in January of 2014.

Lake Minneola High School | Lake County Schools

Lake Minneola High School | Lake County Schools

 

Location: Minneola, FL 

Project Size: 277,000 SF

Construction Cost: $44,915,033

 

Lake Minneola High School was a phased project featuring multiple buildings designed to support nearly 2,000 students in 277,000 square feet of building space. The high school is located on a 60 acre site and included the construction of classrooms, administration, cafeteria, auditorium and gymnasium buildings. The facility also contains a parent drive, bus loop, service drive and parking.

Shady Hills Elementary School Renovation | Pasco County Schools

Shady Hills Elementary School Renovation | Pasco County Schools

Location: Spring Hills, FL

Project Size: 62,960 SF

Construction Cost: $6,500,000

Shady Hills Elementary School was a 63,000 square foot comprehensive renovation project. The existing school, built in 1974, was demolished all the way down to the existing masonry and steel structure. The entire HVAC system was replaced with new multi stage DX rooftop units and VAVs.  The entire plumbing system was replaced including all new underground plumbing.  New electrical, electrical systems, fire sprinkler system, and kitchen equipment were installed.

 Because there were no windows in the original building, 67 new windows were added to the structure. The project also consisted of new site utilities, a new storm water system, expansion of the existing wastewater treatment plant, new parking lots, and new aluminum canopies. Regularly scheduled community meetings were conducted and several teach-ins were conducted with the students.

❮ Previous
Next ❯